Newtown Creek Hydrodynamic and Sediment Transport Studies
“Newtown Creek was designated a Superfund National Priority Site in 2010/2011 under the guidance of the USEPA. A complete condition survey, last performed in 1991, was performed in April 2009 by the USACE New York District. Sampling and testing for possible future upland placement will be coordinated with the NYSDEC, NYCDEP and other stakeholders. The entire channel was last dredged in 1951 with the removal of 80,000 cys of material. In the 1950s and 1960s, portions of Dutch Kills and English Kills were dredged. The channel has been subject to various industrial contaminant inputs along the river over the past several decades. As a result, the material to be removed may be too contaminated to dredge and place in approved upland sites. New York City Department of Environmental Protection is the local sponsor. Economic re-development of the area is planned. Coordination with the NYCDEP is maintained.” Source
EFDC+ is being used extensively in hydrodynamic and sediment transport models that will be applied to Newtown Creek, New York. It is selected due to being open source and being linked to a sediment transport model that has the capability to utilize erosion rate data obtained from Sedflume testing (i.e., SEDZLJ capabilities). Section 4, Modeling Memo 1